Exporting Manufacturing Packages from Altium Designer
This guide details how to generate and export production-ready manufacturing packages from Altium Designer for automated DFM analysis, BOM sourcing risk detection, and client sign-off in BoardReadyOps.
Required Files Checklist
A complete Altium manufacturing package zip bundle must include:
- Gerber Files (RS-274X):
- Top & Bottom Copper (
.gtl,.gblor.g1,.g2, etc.) - Top & Bottom Solder Mask (
.gts,.gbs) - Top & Bottom Silkscreen (
.gto,.gbo) - Board Outline / Mechanical Layer (
.gm1or.gko) - NC Drill Files (Excellon):
- Plated and unplated drill holes (
.drlor.txt) - Bill of Materials (BOM):
- CSV or Excel (
.csv) with columns:Designator,Comment(or Description),Manufacturer Part Number (MPN),Footprint,Quantity. - Pick-and-Place Centroid:
- Text or CSV (
.csvor.txt) with:Designator,Mid X,Mid Y,Rotation,Layer.
Step 1: Export Gerber RS-274X Files
- Open your PCB document (
.PcbDoc) in Altium Designer. - Select File > Fabrication Outputs > Gerber Files.
- In the General tab:
- Units: Inches or Millimeters
- Format: 2:4 (Inches) or 2:5 (Millimeters)
- In the Layers tab:
- Click Plot Layers and select Used On.
- Ensure the board outline layer (e.g. Mechanical 1) is selected.
- In the Apertures tab:
- Check Embedded apertures (RS274X).
- Click OK to generate the Gerber files into your project output directory (
/Project Outputs/).
Step 2: Export NC Drill Files
- In the same PCB document, select File > Fabrication Outputs > NC Drill Files.
- Configure settings matching your Gerber output:
- Units: Match the Gerber units (Inches or Millimeters).
- Format: Match Gerber format (e.g. 2:4 or 2:5).
- Zero Suppression: Suppress leading zeroes or keep trailing zeroes consistently.
- Click OK, then click OK in the Drill Drawing configuration dialog.
- Altium outputs
.TXTor.DRLfiles.
Step 3: Export Pick-and-Place Centroids
- Select File > Assembly Outputs > Generates pick and place files.
- Choose CSV format.
- Units: Metric or Imperial.
- Click OK. Altium will create
Pick Place for <Project>.csv.
Step 4: Export Structured Bill of Materials (BOM)
- Select Reports > Bill of Materials.
- In the BOM configuration window:
- Ensure
Designator,Comment,Manufacturer Part Number,Footprint, andQuantitycolumns are enabled. - Set Export Format to CSV.
- Click Export and save as
bom.csv.
Step 5: Bundle and Ingest
- Place the generated Gerber files, NC Drill file, BOM CSV, and Centroid file into a single
.ziparchive:bash zip -r altium_release_v1.zip Gerbers/ bom.csv pick_place.csv - Upload the archive directly via the BoardReadyOps web wizard or CLI:
bash boardreadyops review --archive altium_release_v1.zip --cad altium